Manufacturing base: doubling output, then digitising it
2007 doubled capacity; 2015 brought the intelligent production software; both matter to export buyers.

Manufacturing base: doubling output, then digitising it
2007 doubled capacity; 2015 brought the intelligent production software; both matter to export buyers.
In 2007 the company's new industrial park plant came online, roughly doubling capacity. In 2015 it brought in intelligent production software to build a made-to-order manufacturing system — the piece that turns individual apartment drawings into a production queue without a human re-typing every panel.
ERP from 2005 and intelligent production software from 2015 are the two dates that matter to an overseas buyer. Everything else being equal, a factory that can accept a drawing-based order file is a factory that can accept a 300-unit project order file without a transcription error.
We state two further commitments: this site quotes against a full drawing set, and a project over 200 units gets a sample cabinet built and packed before the run starts. Those are our own commitments, not the factory's.
Start with
a brief.
Send the drawings and the room list. We will come back with a scope, a finish schedule and a price range.
Buyer questions
What is the minimum order quantity for a project?
The article does not state a minimum order quantity. It states that a project over 200 units gets a sample cabinet built and packed before the run starts. Quotes are given against a full drawing set. Send the drawings and room list to receive a scope, finish schedule and price range.
What is the lead time for a large project order?
The text gives no lead time figures. It describes the process instead: orders are drawing-based, and the factory's intelligent production software turns individual apartment drawings into a production queue without re-typing each panel. For projects over 200 units, a sample cabinet is built and packed before the full run begins.
How does the factory handle large project orders without errors?
The company added intelligent production software in 2015 to build a made-to-order manufacturing system, which converts drawing-based order files into a production queue without manual re-typing of panels. ERP has been in place since 2005. The plant, opened in 2007, roughly doubled capacity. A factory that accepts drawing-based files can take a 300-unit project order file without transcription error.