A shadow gap is an 8–10 mm recessed reveal between door leaf and frame or between wall and skirting, and it must be set at drawing stage because a reveal cut wrong cannot be widened on site. The wall substrate — drywall, MDF lining or masonry — decides how the reveal is built and who owns the tolerance.

A shadow gap is an 8–10 mm recessed reveal that separates a door leaf from its frame, or a wall from skirting and jamb linings. It must be fixed at drawing stage, because a reveal cut wrong cannot be widened on site. The wall substrate — drywall, MDF lining or masonry — decides how the reveal is built.

What is a shadow gap detail, and why does the wall substrate matter?

A shadow gap is a deliberate recess left between two surfaces so the junction reads as a line instead of a joint. On a flush door set it is the gap between leaf and frame. At the floor it is the recess above the skirting. At a wall it is the reveal where the jamb lining meets the plaster or panel face.

The substrate matters because the gap is a tolerance decision as much as a design one. Drywall moves, MDF lining is dimensionally stable but soft at the edge, and masonry is neither straight nor plumb over a full wall height. Each one needs a different way of holding the reveal line, and each one puts the tolerance in a different trade's hands.

In practice, an 8 mm gap is the working minimum. Smaller and it fills with paint and dust and stops reading as a line. Larger and it reads as a mistake rather than a detail.

How does the shadow gap detail differ on drywall, MDF and masonry walls?

The gap dimension stays roughly the same across all three. What changes is the lining that carries it, who sets it out, and how much site correction you should budget for.

Wall substrateHow the reveal is formedMain riskWho owns the tolerance
Drywall / stud partitionJamb lining or reveal profile fixed back to studs, with the plasterboard stopping short of the lineBoard movement and skim build-up closing the gapDrywall fixer and plasterer, then the joinery installer
MDF lining / panelled wallLining panel cut with an integral rebate, or a separate reveal trim set into the panelEdge damage and paint bridging the recessJoinery factory, because the reveal is cut on the panel line
Masonry / block or concreteGrounds or a sub-frame fixed to the wall, with the lining or reveal carried on the frameWall out of plumb, so the gap varies along its lengthMain contractor, because the frame must be packed off the wall

On drywall, the reveal is usually formed by the lining rather than the board, because a plasterboard edge cannot hold a crisp 8 mm line once it is skimmed. On MDF, the reveal can be cut into the panel itself, which gives the cleanest line but makes the panel a factory item rather than a site item. On masonry, nothing should be cut into the wall — the reveal belongs on a frame that is packed and set out independently.

What should be fixed at drawing stage before production starts?

Four things, and all four belong on the approved shop drawing rather than in a site instruction.

  • Gap dimension and its tolerance. State the nominal gap and the permitted variation. A gap specified as 8 mm with no tolerance band will be argued about on site.
  • Who forms the reveal. Factory-cut into the lining, or site-formed by others. This decides whether the reveal is inside the joinery package or outside it.
  • The junction at floor and ceiling. The floor junction and the head detail are separate decisions from the vertical reveal, and they are usually where the line breaks.
  • The setting-out datum. Which face the lining is set from, and what happens when the wall is out of plumb.

This is why shadow gap work is quoted from approved shop drawings rather than a price list. The number is built from door core, finish, hardware and the reveal or jamb lining that meets the wall — and the lining is the part that changes with substrate.

What does a shadow gap package cost and how long does it take?

There is no catalogue price, because the reveal is a drawing-stage item. What can be stated is the commercial frame around it.

ItemFigure
Production lead time25–35 days after drawing approval and deposit
Minimum order for samplingFrom 1 set
Project pricing thresholdFrom 20 sets upward
Ocean freight, 20ft containerTypically USD 1,200–3,500
Destination charges, customs and haulageTypically USD 800–2,500
Total logistics band, 20ftRoughly USD 2,500–6,000
Door-to-door time, production to deliveryUsually 5–8 weeks

Those logistics figures exclude the cabinetry and joinery itself. They vary with port, terms, and whether you ship flat-pack or assembled. For a developer shipping quarterly, FOB with a fixed broker is usually cheaper than DDP; for a first container, DDP removes the most administrative uncertainty.

Why should doors, frames and wall linings come from one supplier?

Because the shadow gap is a shared dimension. If the door leaf comes from one supplier and the wall lining from another, the 8 mm gap is being held by two factories that never spoke, and the error shows up at the junction — the one place the detail is visible.

Producing door leaves, jamb linings, reveal trims, wall panels and skirting on the same panel line means the reveal is cut to the same setting-out logic as the door it meets. It also means one party owns the tolerance instead of two parties negotiating it after the fact.

This is the same specification logic that applies to kitchen cabinetry: carcass material, door finish, hardware brand and the trims that close the junctions are quoted as one build-up, not as separate line items from separate trades.

What should a buyer demand to see in writing?

Ask for the reveal detail as a dimensioned drawing, not a rendered image. The drawing should show the gap dimension, the tolerance band, the lining section, and the junction at floor and head. Ask which party forms the reveal and which party accepts the wall as found.

Ask for the finish schedule alongside it, because paint build-up is the most common reason a correctly cut gap stops reading on site. And ask for the setting-out datum in writing, so the site team is working to the same face the factory drew from.

None of this is exotic. It is the ordinary discipline of a detail that only works when it is decided before anything is cut.

Frequently asked questions

What is the correct width for a shadow gap?

An 8–10 mm gap between door leaf and frame is the working range. Smaller than 8 mm and the recess fills with paint and dust and stops reading as a line; larger than 10 mm and it reads as a construction error rather than a deliberate detail. The dimension should be fixed on the approved shop drawing with a stated tolerance band.

Can a shadow gap be cut on site if it was missed at drawing stage?

No. A reveal cut wrong cannot be widened on site, which is why the gap is a drawing-stage decision. If the lining has already been cut without the reveal, the correction is usually a new lining piece rather than site modification. Fix the dimension and the tolerance before production starts.

Does the shadow gap detail change on a masonry wall?

The gap dimension stays roughly the same, but the method changes. On masonry nothing should be cut into the wall; the reveal is carried on a sub-frame or grounds that are packed off the wall, because block and concrete are rarely plumb over a full height. The main contractor owns that tolerance, not the joinery factory.

Who forms the reveal on a drywall partition?

Usually the jamb lining or reveal profile, fixed back to the studs, with the plasterboard stopping short of the line. A plasterboard edge cannot hold a crisp 8 mm line once skimmed. The drywall fixer and plasterer set the substrate; the joinery installer sets the lining. Both need the same datum in writing.

How long does a shadow gap door and lining package take to produce?

Production runs 25–35 days after drawing approval and deposit. Add ocean freight and clearance: total door-to-door time is usually 5–8 weeks once production, booking, sailing, clearance and haulage are counted. Clearance itself is normally a few working days when documents are clean.

What is the minimum order for shadow gap doors and linings?

Sampling is available from 1 set, priced at sample MOQ rather than project pricing. Project pricing applies from 20 sets upward. On a single-set order the logistics bill is usually the largest line, so sampling is best treated as a specification check rather than a cost-saving route.

What does shipping a shadow gap joinery package cost?

For a 20ft container, ocean freight typically runs USD 1,200–3,500 and destination charges, customs and haulage USD 800–2,500, giving a total logistics band of roughly USD 2,500–6,000 depending on port, terms and whether you ship flat-pack. These are logistics-only figures and exclude the joinery itself.

Why order doors, frames and wall linings from one supplier?

Because the shadow gap is a shared dimension. Split the door leaf and the wall lining between two factories and the 8 mm gap is held by two parties that never coordinated, with the error appearing at the most visible junction. One supplier means one party owns the tolerance instead of two negotiating it afterwards.