Custom cabinetry for Indonesia projects
Five to seven weeks of production plus sea freight. For resort work, deliveries are usually staged against the construction programme rather than shipped in one lot.
One factory, one finish schedule
Kitchens and islands, wardrobes and cloakrooms, bathroom vanities, doors and wall panelling, plus the profiles and hardware that hold them together. Because they are produced in the same plant, the veneer, lacquer and edge details match from room to room instead of drifting between suppliers.
Kitchen and island · Wardrobe and cloakroom · Door and wall system · Bathroom vanity
What this market changes
Coastal humidity and heavy rain mean the same rules as the Philippines: moisture-tolerant board, sealed edges, and ventilation behind tall units. For Bali villas, the design often calls for solid timber and veneer, so the finish schedule is agreed before cutting.
Documents, duty and delivery
Shipments move into Tanjung Priok or Surabaya. Import licensing and the applicable duty depend on the importer's registration and the HS classification, so we supply commercial invoices, packing lists and certificates, and the importer's broker handles clearance.
Production and staging
Five to seven weeks of production plus sea freight. For resort work, deliveries are usually staged against the construction programme rather than shipped in one lot.
Start with
a brief.
Send the drawings and the room list. We will come back with a scope, a finish schedule and a price range.
Buyer questions
Who is the importer of record?
The Indonesian importer, using their own licence. We supply the documents the broker needs; clearance and licensing sit with the importer, not with the factory.
Can you work from our contractor's drawings?
Yes. We convert them into shop drawings with tolerances marked, and nothing is cut until that set is approved.
How is a resort order staged?
Against the construction programme. Rooms or villas are shipped in the sequence the site can install them, rather than in one lot that sits in storage.
What changes for humidity?
Moisture-tolerant carcass board, sealed cut edges and ventilation behind tall units. Coastal projects also need hardware finishes that survive a wet season.